Piece made with a steel prototype mold for various sectors and injected in PC + ABS. A polished finish was applied to the surface and it has a total of 1 + 1 cavities. The guaranteed injection cycles are 20000 and it has a hot chamber No. To complete the mold, the total lead time was 32 days, of which 7 days were for the DFM + 3D and 25 days were for the mold.