Piece made with a steel prototype mold for various sectors and injected in PA66 + 30% GF. A polished finish was applied to the surface and it has a total of 1 + 1 cavities. The guaranteed injection cycles are 15000 and it has a hot chamber No. To complete the mold, the total lead time was 37 days, of which 7 days were for the DFM + 3D and 30 days were for the mold.