Part made with a steel prototype mold for the Automotive industry and injected in PP G30 + Santoprene 101-50. A polished finish was applied to the surface and it has a total of 1 X 1 cavities. The guaranteed injection cycles are 20000 and it has a hot chamber No. To complete the mold, the total lead time was 57 days, of which 7 days were for the DFM + 3D and 50 days were for the mold.